The project includes engineering, procurement, construction, commissioning and start-up works of the Jetty at Hamriyah Port.
The main items of work comprise:
Detailed engineering for breakwater repair, widening and protection.
Installation, testing and pre-commissioning of various services and utilities such as fire fighting piping and pumps, firewater system, slop tanks, utility water pipes, instrument air, and potable water system.
Marine loading/offloading arms
Product transfer pipelines — carbon steel pipes of 16″ dia. for an approx. length of 3,000 lm.
Metering skid
Cathodic protection
Electrical power system