The project included design, furnishing and construction of the offshore cooling water facilities and all services associated with these facilities for the Sidi Krir Units 3 & 4 Power Project.
The main items of work comprised:
Two offshore cooling water intake structures
Two offshore cooling water discharge diffusers
Installation of two intake pipes from the two offshore intake structures to onshore circulating water pumps house interface location.
Installation of two discharge pipes from the offshore discharge diffusers to the onshore interface location.
Dolphins and warning signs
Chlorine piping system
Precast concrete block rip-rap protection

Categories : Marine & Offshore