The turnkey project included the design, supply, construction, installation, testing and commissioning of a 6 x 370 MW units steam turbine power plant.
The main items of work comprised:
Site preparation, soil improvement and site services including landscaping & irrigation, waste water & storm water drainage, evaporation and waste water holding ponds, potable water system and water treatment system, roads & sidewalks, etc.
Buildings and structures including steam generation & power generation buildings, industrial & process buildings, water production and treatment buildings electrical control building, cooling water pumphouse, warehouse, chimney and other buildings and foundation works, etc.
Fuel oil handling system and storage tanks, diesel tanks and water tanks, etc.
Seawater main cooling water pipe work, discharge culverts and channels
Cable tunnels, cable duct banks & trenches, pipe and cable racks, etc.