The project includes works in the facilities collectively referred to as the Yanbu Export Refinery Project (YERP) Terminal Facilities Package (SP-7) which consists of three, non-adjacent areas, within the existing plant.

The main items of work comprise:
A. Red Sea Refining Company Metering Area & Marine Operation Area.
Custody Metering Systems: The custody metering system will be provided for the export products, with new metering skids
Product Slop System
Ship’s Slop System
Instrument Air/Plant Air System
Contaminated Vapor Blower Package
New RSRC Control Room
Sanitary Sewer System
Fire Protection System
Combustible Gas Detection
Drain System — Potentially Contaminated Storm Water
Plant Nitrogen System (PNS)
Site Preparation and Development
New Security Fencing
Automation Facilities
Communications

B. Berths (71 & 72) Facilities (offshore):
New Red Seas Refining Company Product Pipelines: Demolish 4 existing mothballed pipelines (32″ pipeline propone vapor, 30″ pipeline butane recovery, 24″ bunker fuel and 12″ black diesel) totalling 4.0 km.

Installation of same quantity of new RSRC product pipeline (two 30″ Diesel, 30″ Gasoline, 24″ Gasoline recirculation). In addition the project will install 800 meter cantilever extension to the existing trestle. In this over water cantilever, five new pipelines will be installed (18″ contaminated vapor line, 14″ benzene loading, 8″ ship slop, 6″ diesel slop, 6″ gasoline Slop and 3″ benzene slop)

New Tower Cranes: Two new Tower Cranes to be installed, one at each berth, to replace the existing Tower Cranes

New Loading Arms for RSRC Products: Three new RSRC product loading arms to be installed at each berth. A new 16″ Diesel Loading Arm will be installed in the future spot and a new 16″ Diesel loading arm and 12″ Benzene loading arm will replace the two existing mothballed loading arms.

Categories : Industrial , Marine & Offshore