The project included dredging of approx. 10 sq. km. areas to a depth of 2 m from the operation brine level, of salt formations, reefs and salt mushrooms from certain areas within salt pan (SP1 and SP2) forming a part of the solar evaporation system and subsequent deposition of the material resulting there from in spoil areas designated for this purpose. The Site was located at the Arab Potash Company’s existing works at the South end of Dead Sea approx. 230 km from the Port of Aqaba and 130 km from Amman.
Major quantities:
Dredging area: 10 sq. km.
Categories : Marine & Offshore