The project included detailed engineering, procurement and construction of four berths on gravity structure comprising of common approach jetty and back to back R.C. loading platform, breasting and mooring dolphins and catwalks. The relieving platform is constructed on bored concrete piles.The contract also included construction of a common building, electric substation, fire fighting facilities, navigational aids, oil spill control equipment and lighting amongst other topside installations as well as testing and commissioning of the project.

The main items of work comprised:
Total reclamation: 182000 m3
Concrete works: 194000 m3
Rocks: 497000 m3
Piling eorks (900mm dia): 3900 lm (176 nos.)

Categories : Industrial , Marine & Offshore