The project included engineering design, procurement, construction, installation, testing and pre-commissioning of the methanol plant modifications for the Carbon Dioxide addition project.
The main items of work comprised:
— Buildings for chilled water pump house (steel framed and concrete)
— Concrete foundations for machinery
— Fire and gas protection
— Machinery and equipment
— Pipe works and Instrumentation works