The EPC project included a marine terminal for oil tankers ranging in size from 20,000 to 100,000 tonnes with facilities for unloading crude and heavy fuel oil and include the following civil, mechanical, instrumentation and electrical works.

The main items of work comprised:
Piled access jetty, unloading platform, breasting and mooring dolphins, walkways and all associated fittings.
Ancillary buildings including control building, foam pump house, store and electrical substation.
Tanker access telescopic gangway and pedestrian access gangway.
Four hydraulically powered fuel unloading arms and two fuel unloading pipelines with all associated valves; oil slops systems and thermal insulation.
Two flow metering stations and two automatic pipeline samplers.
Oil spill control for the access jetty and unloading platform.
Instrumentation and controls including marine terminal control room equipment, distance viewing, warning lights, speed of approach equipment, weather recording equipment and communications and telephone systems.
Power distribution, protection and control quipment.
Navigational aids including lighted buoys. Total quantitiy of piling works: 1016mm dia steel piles : 8,300lm.