The project included the construction of the second seawater cooling pumping plant and auxiliary facilities to meet the demand of water by the industries and increase seawater cooling system capacity at jubail industrial city. The second pumping plant increases a total combined capacity of 101.6 cu.m./sec.
The main items of work comprised:
The works covered under this contract included extension of dredged intake channel and supply channel, pumping plant workshop, head works, electrical equipment building, chlorination plant building and pumphouse. A third standby generator, one boat launching ramp, one vip pier, a workshop substation, a mosque and new control panels to be installed in the existing control building.
Electrical, mechanical and instrumentation works:
Installation, operation, testing and commissioning of eight seawater cooling pumps with associated chlorination equipment, four drum screens, twenty eight headworks sluice gates, chlorination gates and drainage gates. One standby gas turbine generator, electrical equipment and cables, two gantry cranes and one workshop crane.
Chlorination distribution pipework and valves, seawater cooling pump discharge piping. Electrical cabling conduits, fittings, cable tray for lighting, grounding, cathodic protection and fire alarm system.
Also included are surface water drainage, foul water drainage, potable water system, oil water and emergency acid drainage system, treated water irrigation system and oil spill protection system.