The project included the construction of 3 berths to handle seagoing tankers ranging from 3,000 dwt to 80,000 dwt.

The main items of work comprised:
— a loading platform
— 5 nos. breasting dolphins
— 4 nos. mooring dolphins
— an access trestle
— 6 nos. catwalks all supported on tubular steel piles, concrete works and associated structural steel together with wharf fittings.

The mechanical works include
— HVAC
— firewater system
— potable water system
— slop water systems
— substation
— cables
— switchgear
— lighting and navigational aids

Also includes
— roads
— pavings
— culverts
— building works

Categories : Marine & Offshore