The project included the maintenance of railroad networks which are spreaded over Dammam, Riyadh and Hofuf lines.
The main items of work comprised:
Main Line: 12.90 Km
Double Line: 449 Km (Line 1), 556 Km (Line 2)
Branch Line : 474 Km
Categories : Infrastructure