The turnkey project included engineering, procurement, construction, commissioning and start-up of a new cooling water system including inlet and outfall pipelines and extension of the container yard.
The main items of work comprised:
Civil works:
— Quay wall of 390 m long including dredging, pre-casting and placing of quay wall blocks, cast in situ capping beam, etc.
— Pump House approx. 20.1m x 36.2 m
— Intake GRP pipelines (2 Nos.) of 1.800 mm dia each (Discharge pipeline and Offshore pipeline system)
— Low Voltage Building
— Reinforced concrete culverts, trenches, etc
— Chlorination tank area
Electromechanical works:
— Installation and commissioning of 6.6 KV cables for seawater pumps, LV/MV transformers, electrical panels, etc.
— PA/GA and fire alarm systems for the pump house area as well as instrumentation and PLC control systems.
— Utility networks including HVAC system.