The project included designing and building for the construction of three pumping stations for the branch 3 canal includes all civil, mechanical, electrical and instrumentation works. The major works include construction of main pumphouse with concrete intake and discharge basin, installation of pumping sets, ancillary buildings, guard houses, fire protection system, sanitary facilities, electrical panels, cables and controls, roads, parking areas, slope protection and landscaping.
The main items of work comprised:
The capacity of the pumping stations being as follows:
ps1 : 7 pumps (6 on-duty+1 stand-by) each having a flow rate of 8.68m3/sec.
ps2 : 5 pumps (4 on-duty+1 stand-by) each having a flow rate of 8.68m3/sec.
ps3 : 5 pumps (4 on-duty+1 stand-by) each having a flow rate of 4.34m3/sec.