The project included cooling water intake pipework for the Zawia combined cycle power plant.

The main items of work comprised:
Dredging of seabed trench for a total length of 390 m and depositing the dredged material at one side of the trench.
Total Volume of Dredging: 148,300 m3.
Installation of four rows of 2600mm dia. GRP pipes in the seabed trench extending approx. 390 m from shoreline.
Installation of 4 nos. pre-cast concrete intake heads.
Backfilling of the trench using excavated material and armor rocks.

Categories : Industrial , Marine & Offshore