Saudi Arabia — North/South Railway Project CTW 100: Track Laying Works

The project included track installation including tamping, welding, distressing and grinding, turnouts of guard rails, derails, bumping posts, K.M marker points, alignment stakes for the North/South railway project.

The main items of work comprised:
Main line: 625.50 LM
Siding line: 82,367 LM
Secondary siding tracks: 54,723 LM
Destressing: 732,852 LM
Turnouts: 211 Nos
Bumping Posts: 43 Nos
Tamping: 186,369 m
Alignment Stakes: 5,200 Nos


  • Construction From: 05/2008
    Construction To: 11/2012
    Consulting Enginner: The Louis Berger Group Inc. in J.V. with Canarail Consultants Inc. Systra S.A.and SCEC K & A
    Contract Amount (IN "000" US$): 110,876
    Archirodon Portion: (50% J.V.)