Maintenance of Complete Railways Network

The project included the maintenance of railroad networks which are spreaded over Dammam, Riyadh and Hofuf lines.

The main items of work comprised:
Main Line: 12.90 Km
Double Line: 449 Km (Line 1), 556 Km (Line 2)
Branch Line : 474 Km


  • Construction From: 01/2006
    Construction To: 02/2009
    Consulting Enginner: Engineering Dept. of Saudi Railways Organization
    Contract Amount (IN "000" US$): 13,857
    Archirodon Portion: 100%
    Owner: Saudi Railways Organization