YANSAB Olefins Plant 1 — Precast Concrete Pipe Racks

The project included supply and installations of main and secondary precast concrete pipe racks with insitu concrete strong points including earthworks and foundations.

The main items of work comprised:
Concrete: 16,247 m3
Rebars: 2,096 m.t.


  • Construction From: 03/2006
    Construction To: 04/2007
    Consulting Enginner: Mr. F. Pennacchio Technip Construction Manager
    Contract Amount (IN "000" US$): 13,547
    Archirodon Portion: 100%
    Owner: Saudi Basic Industries Corporation (SABIC) Main Contractor: Technip Saudi Arabia Ltd