Shoaiba IWPP — Design and Construction of Chimney

The project included basic and detailed design and supply and erection of chimney including necessary temporary works, excavation and foundation works as well as commissioning of systems and equipment. A single wind-shield chimney with three flue gas pipesis having an outer wind-shield of reinforced concrete construction

The main items of work comprised:
— Ladder access system
— Lighting
— Internal lift opening
— Platform Cable trays
— Air craft warning light


  • Construction From: 10/2006
    Construction To: 04/2008
    Consulting Enginner: Fichtner GmbH&Co.KG Stuttgart, Germany
    Contract Amount (IN "000" US$): 15,850
    Archirodon Portion: 100%
    Owner: Shoaiba Water and Electricity Company