The project included concrete repair and rehabilitation works for various areas and structures of desalination plants under Phase I & II

The main items of work comprised:
Desalination areas and Power Plant areas.
Boiler area and Power House
Intake Structures including Chlorination area
Power Utility Structures
Seawater Booster Pump House
Cable Tunnels, Trenches and Pits
Outfall Channel and Discharge Outlets
Blending Stations
Pipe Bridges
Road Bridges


  • Construction From: 01/2006
    Construction To: 04/2009
    Consulting Enginner: SWCC Planning Dept.
    Contract Amount (IN "000" US$): 26,281
    Archirodon Portion: 13,140 (50%)
    Owner: Saline Water Conversion Corporation (SWCC)