Qatar — Messaieed: Topsides Facilities to the Multi Products Berth

The project incuded engineering, procurement and construction of the topsides facilities to the multi products berth.

The main items of work comprised:
Supply and installation of mech electrical topsides works to an existing berth including metering skids and loading arms.
Construction of ancillary administration building, fire station, electrical substation and renovation works.
Associated external access roads and infrastructure.
Removal of existing 24″ dia. Submarine oil pipeline.
Construction of 1 no. Mooring dolphin involving precast blocks and in situ concrete.
Dredging 90,000 m3.


  • Construction From: 07/2002
    Construction To: 08/2005
    Consulting Enginner: ENERCO Engineering and Consulting
    Contract Amount (IN "000" US$): 29,977
    Archirodon Portion: 100%
    Owner: Qatar Petroleum