Qatar — Messaieed : Revamping for Methanol Plant

The project included engineering design, procurement, construction, installation, testing and pre-commissioning of the methanol plant modifications for the Carbon Dioxide addition project.

The main items of work comprised:
— Buildings for chilled water pump house (steel framed and concrete)
— Concrete foundations for machinery
— Fire and gas protection
— Machinery and equipment
— Pipe works and Instrumentation works


  • Construction From: 01/2006
    Construction To: 04/2007
    Consulting Enginner: The Client (QAFAC)
    Contract Amount (IN "000" US$): 22,469
    Archirodon Portion: 100%