The project included the design furnishing, construction, testing and commissioning of a new tanker terminal at the desalination plant to accommodate vessels of between 40,000 dwt and 100,000 dwt and designed for vessels up to 200,000 dwt.
The main items of work comprised :
Unloading platform
Two berthing dolphins
Four mooring dolphins
Approach way or causeway in the shallow water and a trestle structure in deep water
Dredging and excavation works
Ancillary buildings, roads and sewage system
All the structures such as trestle structure, unloading platform and dolphins are constructed on tubular steel piles.

Total quantity of piling works:
1016 mm dia steel piles : 9,500 lm.
All services including electro-mechanical works and potable water supply system.